BUILDING PERMIT INFORMATION

LINK TO BUILDING PERMIT APPLICATION AND FEES

LINK TO FLOODPLAIN APPLICATION


Fees are rounded down to the whole dollar
Permits will not be issued or projects scheduled for review, until fees are paid
Functional space includes basements/ attics but only when being finished and accessed by a fixed stairway

Instructions for ALL Permit Applications:

NOTE - NEW PROCEDURAL CHANGE FOR ALL APPLICATIONS - When filing building permit applications, for consideration by the Planning Board, those applications must be filed with the Addison Town Clerk no later than the 20th of the month to be considered by the Addision Planning Board during the first meeting after that date. Late filings will be considered by the Planning Board during the next month's regularly scheduled meeting. This change allows the Planning Board ample time they need to assure all applications are completed and for review by the review subcommittee.

INSTRUCTIONS FOR ALL NEW APPLICATIONS

- Complete signed permit application
- Obtain valid E-911 address
- Install required signage
- Correct map & lot number
- Enclose appropriate fee
- Include drawings of proposed structure with all dimensions
- Show proposed use of area
- Include Site Plan that shows entire parcel with lot lines, roads with sidelines, right of way with sidelines, existing structure, location of proposed construction, and magnetic north.
- Include plumbing permit if applicable
Plumbing permit needed when:
- An installation or alteration of subsurface wastewater disposal system
- An installation or alteration of plumbing system
- Addition of one or more bathrooms
Instruction for Shore Land Zone Applications:
- Complete shore land zone section of application
- Slopes 20% apply only to proposed building site, not in general
- If application is not signed by owner, attach letter of authorization
- Include a cross sectional drawing that shows max. height of structure above the grade, all proposed/existing driveways, parking areas and other non-vegetated surfaces
- Include a site plan identifying water body or wetland, show setback from high water line or upland edge of wetland, soil/erosion control plan and any activity such as filling or grading to   complete such a plan





HOME  Town Office Information  Meetings/Minutes Building Mainteneance - Pics/Mtgs   Tax Information  Maps  Town Ordinances and Comprehensive Plan  Permits/Licenses  Schools/Churches/Libraries  Business Listings  Artist Listings  Recreational Land  Town Landings/Tide Charts  Census Data  Community Services and Organizations  Social Activities  Addison Photos  Addison News